Every costly construction problem starts with missing information.
Specro turns incomplete drawings, project information, photos and notes into structured scopes and documentation — helping builders define projects and contractors build better quotes.
See how Specro works- Drawing does not identify insulation typeMissing information
- Temporary protection not identifiedPotential scope gap
- Disposal of excavated materialRecommended assumption
- Missing finish specification — patioMissing information
- Site plan A-101.pdf
- Backyard photos (6)
- Homeowner email
- Your notes
One construction intelligence platform.Two purpose-built products.
Upload drawings, capture project requirements, identify missing information and create specifications, trade scopes, selections, procurement requirements and construction-ready documentation.
Upload drawings, jobsite photos and notes. Specro identifies the likely work, highlights missing information, recommends assumptions and helps turn the scope into an estimate and professional proposal.
Construction information gets lost between the builder and the trade.
Builders need complete scopes. Trades need complete information. When either is missing, the cost shows up later — as change orders, disputes and lost margin.
Builders define what gets built.
Trades define what gets priced.
From incomplete drawings to a construction-ready project.
- 01 / Project definition
- 02 / Specifications
- 03 / Trade scopes
- 04 / Procurement
- Project DefinitionComplete
- Builder Standards AppliedTier 3 — Custom
- Finish LevelPremium
- Selections — Plumbing4 outstanding
- Selections — AppliancesNot started
- Procurement — Long leadWindows unconfirmed
- Trade Scopes Issued9 of 11
- Phase CoordinationOn schedule
From incomplete job information to a quote you can stand behind.
Specro doesn't decide for you. It flags what's unclear, recommends an assumption, and lets you choose — so every price is backed by a defined scope.
- 01Upload
- 02Scope
- 03Review
- 04Price
- 05Proposal
- Status
- Not specified in drawings
- Recommended assumption
- Carry 150 mm compacted sand bedding under the shell, per manufacturer installation guide.
Specro