Specro Trade / Electrical
Electrical quotes that settle the panel, the permit and the fixtures first.
Panel capacity, who supplies fixtures, permit and inspection fees and access to existing walls decide the real cost. Specro Trade flags them early.
01 / Commonly missed
What electrical quotes usually miss
Panel capacity
An upgrade can be the largest line on the job.
Fixture supply
Owner-supplied or contractor-supplied?
Permit and inspection
Fees and trips add up.
Access to existing walls
Fishing wire vs open framing.
02 / Workflow
Upload, scope, review, price, propose
- 01Upload
- 02Scope
- 03Review
- 04Price
- 05Proposal
03 / Typical scope
A electrical scope Specro helps you build
- Rough-in by circuit
- Device and fixture install
- Panel and service work
- Permit and inspections
- Patching responsibility
Specro suggests; you decide. Every line can be confirmed, changed, excluded or turned into a question for your client.
Build your next quote with nothing missing.
Start free. Upload a job, review the scope, price it and send a proposal — no sales call needed.
Specro