Free template

Free residential construction specification and scope-of-work template.

Twenty-five sections covering everything from site setup to closeout, written the way a homeowner can read it and a trade can price it. Copy it, download it as a Word document, and make it yours.

No email required. Paste straight into Word, Google Docs, or an email.

How to use this template

A specification is the only place a project's quality standard is actually written down. Drawings show where things go. The specification says what they are, whose responsibility they are, what dollar figure is carried, and what is not in the price at all.

Work through it in order. Under each section, keep the four headings — Included, Selections required, Allowances, Not included — because that is the structure that stops arguments later. Delete a line only when you are certain it does not apply; silence is not an exclusion. Every dollar figure you carry belongs in the allowance schedule at section 23, and every exclusion belongs in the single list at section 24, stated once.

Two rules make the difference between a template and a usable document. First, name the product or the measurable performance criteria it must meet, never "as per builder's standard." Second, tie each outstanding selection to the date the trade needs it, not to a vague "TBD."

The template

Residential construction specification and scope of work — 25 sections.

1. Project Snapshot

Identifies the project, the parties, the drawings the price is based on, and the contract basis.

Included
  • Project address, legal description, and lot/municipal file numbers
  • Owner, builder, designer, and engineer of record with contact details
  • Drawing set title, revision number, and date the price is based on
  • Conditioned area, garage area, deck/porch area, and storey count
  • Governing code edition and authority having jurisdiction
  • Contract and pricing basis (fixed price, cost plus, or management fee)
Selections required
  • Confirm the drawing revision that governs before signing

2. Contract Scope & Boundaries

States what areas and responsibilities are inside the contract, and what sits with others.

Included
  • Areas of work included in this contract
  • Work by owner, by separate contract, and by utility
  • Limits of work at the property line and at any existing structure
  • Phasing and sequencing assumptions the price relies on
Not included
  • Any work shown on drawings but expressly listed in the Exclusions schedule

3. Owner & Builder Responsibilities

Defines who decides what, and by when, so late decisions do not become disputes.

Included
  • Selection deadlines tied to the construction schedule
  • Submittal, shop drawing, and sample review process
  • Permit responsibility and who pays permit and development fees
  • Process for owner-supplied materials, appliances, and fixtures
  • Consequences of late decisions on schedule and price

4. Existing Conditions (renovations and additions)

Records what is being kept, what is unknown, and how concealed conditions are handled.

Included
  • Areas affected and areas existing to remain
  • Protection of finishes, landscaping, and owner possessions
  • Matching limitations for existing finishes, trim, and flooring
  • Hazardous material survey responsibility
Not included
  • Remediation of concealed structural, moisture, or hazardous conditions found after opening walls

5. Site Setup, Access & General Requirements

Lists the temporary facilities and site controls carried in the price.

Included
  • Site fencing or hoarding, and tree protection where required
  • Erosion and sediment control, mud mat, and street sweeping
  • Temporary power, temporary heat, water supply, and portable washroom
  • Waste bins, hauling, and final construction clean
  • Site signage and general hoisting or crane access
Not included
  • Security monitoring, cameras, and after-hours site guarding

6. Removal, Demolition & Preparation

Defines what comes out, who hauls it, and what is protected or salvaged.

Included
  • Selective or full demolition of listed elements
  • Temporary support of remaining structure during removal
  • Bins, loading, hauling, and disposal of demolition debris
  • Salvage of items identified for reuse by the owner

7. Groundwork & Site Services

States where each service starts, where it terminates, and how far the run is priced.

Included
  • Water, sanitary, and storm service to municipal standard
  • Sump discharge, gas, electrical, and communications conduit
  • Trenching, bedding, backfill, and service inspections
  • Stated run length for each service from connection point to building
Not included
  • Off-site works, road cuts, and utility upgrade charges levied after contract

8. Surveying & Construction Layout

Confirms how many surveyor attendances are carried and what each produces.

Included
  • Boundary verification and building envelope stakeout
  • Excavation and footing pins, foundation wall layout, and benchmark
  • Grading stakes and final as-built grading plan

9. Excavation, Subgrade & Backfill

Covers dirt handling, fill materials, and grading — the most common source of extras.

Included
  • Topsoil stripping with stockpile on site or off-haul (state which)
  • Bulk excavation to underside of footing
  • Granular fill, clear stone drainage backfill, and compaction
  • Driveway and parking pad subgrade preparation
  • Positive rough grading away from the building
Not included
  • Shoring, rock removal, dewatering, and import/export of unsuitable soils unless priced separately

10. Foundation & Concrete

Describes the foundation system, waterproofing, and slabs.

Included
  • Footings, foundation walls, reinforcement, and slabs
  • Foundation window openings, sleeves, chases, and blockouts
  • Damp-proofing or waterproofing and perimeter drainage
  • Under-slab vapour barrier, insulation, and radon rough-in where required
Selections required
  • Garage and basement slab finish and control joint layout

11. Structural Frame

States which members are solid-sawn and which are engineered, per assembly.

Included
  • Floor, wall, and roof framing per drawings or engineer's letter
  • Beams, posts, sheathing, blocking, and framed openings
  • Engineered shop drawings and hoisting of framing packages
  • Weather protection of framing materials on site

12. Roof Assembly

Names the roofing product or its performance criteria, plus drainage.

Included
  • Roofing material, underlayment, and ice and water protection
  • Roof flashings, penetration flashing, and vent stacks
  • Roof ventilation to code
  • Eavestrough, downspouts, outlets, and gutter guards if included
Selections required
  • Shingle or metal profile and colour

13. Exterior Openings

Window and door schedule with manufacturer, series, and ratings.

Included
  • Window and exterior door units by manufacturer and series
  • Frame material, operation, glazing, low-E, and gas fill
  • U-factor, SHGC, and air-water-structural ratings
  • Screens, hardware, operators, and colour
Allowances
  • Exterior door hardware allowance — state amount, supply only

14. Exterior Envelope & Finishes

Cladding, trim, and the sealant and flashing details that keep water out.

Included
  • Cladding system, rainscreen or drainage cavity, and fastening
  • Exterior trim, soffit, fascia, columns, and beams
  • Colour-matched sealants at windows and doors
  • Head and sill flashing at all openings
Selections required
  • Cladding material, profile, and colour by elevation

15. Thermal, Air & Moisture Control

Insulation and air sealing described by assembly, not by product list.

Included
  • Cavity, attic, under-slab, and rim joist insulation by assembly
  • Continuous exterior insulation and water-resistive barrier strategy
  • Air and vapour barrier, sealing, fire stopping, and draft stopping
  • Blower door test and target airtightness result

16. Mechanical Systems

Heating, cooling, ventilation, and their controls.

Included
  • Furnace or heat pump make, model, and capacity
  • Air conditioning, HRV/ERV, and range hood make-up air
  • Ductwork, registers, zoning, and thermostat locations
  • Commissioning, balancing report, and equipment warranty registration
Selections required
  • In-floor heat zones and thermostat model

17. Plumbing

Rough-in scope plus who supplies fixtures and at what allowance.

Included
  • Water supply, drain-waste-vent, and hose bibs by count and location
  • Water heater type and capacity
  • Fixture rough-in count by room
  • Installation of all owner-selected fixtures
Allowances
  • Plumbing fixture and faucet allowance — state amount, supply only

18. Electrical & Low Voltage

Device counts, panel size, and the lighting allowance.

Included
  • Service size, panel, and generator or EV rough-in if included
  • Device counts by room: receptacles, switches, and data drops
  • Smoke and carbon monoxide alarms to code
  • Installation of owner-selected light fixtures
Allowances
  • Light fixture allowance — state amount, supply only

19. Interior Finishes

Drywall, paint, flooring, tile, and trim by room.

Included
  • Drywall type, level of finish, and ceiling texture
  • Paint system: primer plus number of finish coats, sheen by room
  • Flooring, tile, and underlayment by area
  • Interior doors, casing, baseboard profiles, and hardware installation
Allowances
  • Flooring and tile supply allowances — state per square foot

20. Millwork, Counters & Built-ins

Cabinetry scope and where the line sits between supply and install.

Included
  • Kitchen, bath, and built-in cabinetry supply and installation
  • Countertop template, fabrication, and installation
  • Closet systems and shelving where shown
Allowances
  • Cabinetry allowance and countertop allowance — state amounts

21. Appliances, Equipment & Specialties

Who buys, who receives, and who installs.

Included
  • Receipt, uncrating, and installation of owner-supplied appliances
  • Fireplace unit, surround, and venting where included
  • Bath accessories, mirrors, and shower enclosures
Not included
  • Appliance supply unless carried as an allowance

22. Site Work, Landscaping & Exterior Flatwork

Everything outside the building footprint.

Included
  • Final grading, topsoil placement, and sod or seed
  • Driveway, walkway, and patio base and surface
  • Decks, porches, railings, and steps
Not included
  • Fencing, planting beds, irrigation, and retaining walls unless listed

23. Allowance Schedule

One authoritative table of every dollar figure carried in the contract.

Included
  • Item, allowance amount, what it covers, and whether it is supply only
  • How overages and credits are calculated and billed
  • Date each allowance must be converted to a firm selection

24. Exclusions

The single authoritative list of what is not in the price.

Included
  • Every excluded item, stated once, in one place
  • Items excluded because of unknown conditions, with the trigger for repricing
  • Permit, levy, and development charges not carried

25. Warranty, Closeout & Handover

What the owner receives at the end and for how long it is covered.

Included
  • Workmanship warranty period and third-party warranty enrollment
  • Deficiency walkthrough process and correction window
  • Manuals, warranty documents, as-builts, and key handover
  • Final clean and site restoration

Stop filling in the template

Specro generates a 32-section specification from your builder standards, finish level, and project definition — with the allowance schedule and exclusions list reconciled against the rest of the document. Same structure as this template, written for the actual job.

Common questions

What is a construction specification template?
It is a structured written document that sets out what will be built and to what standard — materials, assemblies, inclusions, allowances, selections still outstanding, and exclusions. Drawings show geometry; the specification carries everything geometry cannot express.
What is the difference between a specification and a scope of work?
A scope of work lists the work a party is responsible for performing. A specification describes the quality standard and products that work must meet. On residential projects the two are usually combined into one document, which is how this template is organized.
Is this template free to use?
Yes. Copy or download it and adapt it for your own projects. Replace the placeholder language with your own standards, allowance amounts, and product selections before issuing it with a contract.
How detailed should a residential specification be?
Detailed enough that a trade can price it without calling you, and a homeowner can read it without a translator. In practice that means naming products or measurable performance criteria, stating allowance amounts, and keeping one authoritative exclusions list.
Do I have to fill this out by hand?
No. Specro generates a project-specific specification from your builder standards, finish level, and project definition, so the document reflects the actual job rather than a template you edited under deadline.

See Specro turn your next project into a construction-ready plan.

30 minutes. We'll walk you through the platform using a project type that looks like yours.